Quality Assurance

Main  achievements  in  Quality  Management
1. Our company  has  been  involved  in  the  hydraulic  oil  tank  and  hydraulic  power unit  business  since  2013.Since  the  first  welding  robot  was  put  into  operation  in January  2015,we  have  completely  abandoned  the  traditional  seam  welding  process, resulting  in  a  significant  improvement  in  welding  quality.After  the  introduction  of  KUKA arc  welding  robots  in  2016,welding  speed  was  increased  and  welding  quality  was ensured.Thanks  to  new  technologies,the  welds  have  achieved  optimal  aesthetics.The number of welds for one oil tank is reduced from 9 to only 3.Under the coordination between the welding fixture  and  the positioner,all 3 welds  can be completed in a single pass,minimizing  the  number  of  arc  strikes  and  crater  cracks.This  advanced  welding process  has  become  our  second  largest  competitive  advantage.

2. Current   quality   control   measures   include   four   parts,namely,self-inspection, mutual  inspection,two  airtightness  tests,and  process   inspection  by  dedicated   quality inspectors.  Mutual  inspection  and  the  airtightness  tests  are  highlighted  as  follows. Mutual  inspection  means  that  work  completed  in  the  previous  process  is  inspected  in the  subsequent  process  on  the  production  line.If  a  quality  issue  in  the  previous process is missed and carried over to the subsequent process,it will be detected there, and operators of the  previous  process will  be  promptly  notified  for  correction.For  each case  identified  by  the  subsequent  process,a  reward  equivalent  to  2%of  the  product value is granted,whereas operators of the  previous  process are subject to a penalty of 4%of  the  product  value.If  the  current  process  fails  to  inspect  the  previous  process properly  and  the  defect  passes  to  the  next  process,where  it  is  detected,the  current process  shall  bear  the  same  quality  penalty  as  the  previous  process.In  this  case, should  the  current  process  neglect  inspection  of  the  previous  process's  work,it  will forfeit  the  reward  originally  owed  to  the  previous  process  and  assume  its  quality penalty.This rule applies to all processes on the production line.
The  two   airtightness  tests are: first,testing   of  all   welded  joints,and   second, post-assembly  testing  of  all  components  during  the  weld  finishing  process.

Scroll to Top